Daxion Technologies Ltd

Engineering the Future of
Smart Construction

Built by engineers, for engineers. We design enterprise-grade software that bring clarity, control, and confidence to complex environments.

Traklio Dashboard

Our Mission

"Transform construction delivery through data-driven quality, intelligent workflows, and connected job sites."

Why Daxion?

Construction projects generate massive amounts of data—but very little insight. Daxion bridges this gap by unifying quality, project control, and site intelligence.

Construction-first

Designed for EPCs, developers, and infrastructure owners.

Quality-led

Built around inspection, compliance, and assurance.

Future-ready

AI-ready software with hardware and wearable integration.

Enterprise-grade

Secure, scalable, and audit-ready by design.

Total Visibility

Real-time insights from ground level to management.

The Traklio™ Suite

A Unified Construction Intelligence Platform. Modular, scalable, and purpose-built to manage construction quality and delivery across the entire project lifecycle.

🛡️

Traklio Assure

Digital Quality & Compliance

Moves teams away from reactive inspections and paperwork-heavy processes.

  • Inspection & Test Plans (ITPs)
  • NCR & Punch List Management
  • Corrective Actions (CAPA)
  • AQL & Intelligent Sampling

Outcome

✔ Reduced rework
✔ Clear accountability
✔ Measurable performance
Assure
🏗️

Traklio Build

Connected Project Execution

Brings structure to site operations and transparency to project teams.

  • Task & Workflow Coordination
  • Site Progress Tracking
  • Field-to-Office Sync
  • Document & Drawing Control

Outcome

✔ Faster decisions
✔ Better coordination
✔ Fewer site disruptions
Build

Designed for the Real
Construction World

Traklio is built around how construction actually works, not how generic software assumes it does.

Solar & Infra
Field Optimized
Mobile First
Compliance Ready

Build with Certainty.